Leith Outer Berth   Description.  FMD was contracted as a subcontractor to Graham Constructions to complete the following scopes of work as part of the Leith Outer Berth project;  Demolition of existing steel outer jetty structure. This included the demolition and...
Greencastle Breakwater

Greencastle Breakwater

Greencastle Breakwater Donegal Project. Scope of work includes placement of 250,000 tonnes of 3 different rock materials to extend existing breakwater structure.

Teesport Phase 3

Teesport Phase 3

Teesport Harbour Development, Teesport, Middlesbrough, England Challenges presented Removal of 45,000M³ of mud-stone to -14.5CD Disposal site 12NM East of Teesport Port during winter conditions Removal of existing material against pre-installed steep Sheet piles at...
Invergordan

Invergordan

Invergordan Service Base, Invergordan, Scotland Invergordan Service Base, Invergordan, Mc Laughlin & Harvey in conjunction with DLF Daviot Group engaged Foyle & Marine Dredging to supply a long reach excavator to carry out extensive rock armour protection...
Teesport Phase 3

Teesport

Teesport Harbour Development, Teesport, Middlesbrough, England Challenges presented Removal of 45,000M³ of mud-stone to -14.5CD Disposal site 12NM East of Teesport Port during winter conditions Removal of existing material against pre-installed steep Sheet piles at...