Ullapool Dredging

Ullapool Dredging

Ullapool Dredging Description.  FMD was Subcontracted to dredge approximately 9000m3 of silty gravel material into a split hopper barge and disposal at the nearby approved disposal site. The works included 7 separate sections/pockets of dredging within the harbour. ...
UIG Harbour Redevelopment

UIG Harbour Redevelopment

UIG Harbour Redevelopment  Description.  FMD was Subcontracted to dredge approximately 27,000m3 of seabed material into a split hopper barge and disposal at the nearby approved disposal site.  A busy site with various interactions with other marine construction...
Leith Outer Berth

Leith Outer Berth

Leith Outer Berth   Description.  FMD was contracted as a subcontractor to Graham Constructions to complete the following scopes of work as part of the Leith Outer Berth project;  Demolition of existing steel outer jetty structure. This included the demolition and...
Clyde Waterfront Renfew Dredging

Clyde Waterfront Renfew Dredging

Clyde Waterfront Renfrew Riverside Description.  Dredging approximately 25,000m3 of seabed material to -10mCD, within the works area, and disposal at the project-approved disposal ground at Cloch Point.   These dredging works were on the project critical path as they...
Caisson Removal, Dublin Port

Caisson Removal, Dublin Port

Ramp 3 Caisson Removal Dublin Port Description.  Scope included the demolition and removal of 2 number concrete caissons within Dublin Port. Each caisson was made up of a concrete structure, with 4 reinforced concrete external walls, a top deck, and a base slab. The...