by meanitadmin | Mar 19, 2024
Ullapool Dredging Description. FMD was Subcontracted to dredge approximately 9000m3 of silty gravel material into a split hopper barge and disposal at the nearby approved disposal site. The works included 7 separate sections/pockets of dredging within the harbour. ...
by meanitadmin | Mar 19, 2024
UIG Harbour Redevelopment Description. FMD was Subcontracted to dredge approximately 27,000m3 of seabed material into a split hopper barge and disposal at the nearby approved disposal site. A busy site with various interactions with other marine construction...
by meanitadmin | Mar 19, 2024
Leith Outer Berth Description. FMD was contracted as a subcontractor to Graham Constructions to complete the following scopes of work as part of the Leith Outer Berth project; Demolition of existing steel outer jetty structure. This included the demolition and...
by meanitadmin | Mar 19, 2024
Clyde Waterfront Renfrew Riverside Description. Dredging approximately 25,000m3 of seabed material to -10mCD, within the works area, and disposal at the project-approved disposal ground at Cloch Point. These dredging works were on the project critical path as they...
by meanitadmin | Mar 19, 2024
Ramp 3 Caisson Removal Dublin Port Description. Scope included the demolition and removal of 2 number concrete caissons within Dublin Port. Each caisson was made up of a concrete structure, with 4 reinforced concrete external walls, a top deck, and a base slab. The...