by meanitadmin | Mar 19, 2024
Leith Outer Berth Description. FMD was contracted as a subcontractor to Graham Constructions to complete the following scopes of work as part of the Leith Outer Berth project; Demolition of existing steel outer jetty structure. This included the demolition and...
by meanitadmin | Mar 19, 2024
Ramp 3 Caisson Removal Dublin Port Description. Scope included the demolition and removal of 2 number concrete caissons within Dublin Port. Each caisson was made up of a concrete structure, with 4 reinforced concrete external walls, a top deck, and a base slab. The...
by meanitadmin | Mar 19, 2024
South Bank Quay DescriptionFMD was contracted as a subcontractor to Graham Constructions to complete the following scopes of work as part of the South Bank Quay – 450m quay construction. Demolition of the following existing structures Tarmac Jetty Demolish Tarmac...