Ullapool Dredging

Description. 

FMD was Subcontracted to dredge approximately 9000m3 of silty gravel material into a split hopper barge and disposal at the nearby approved disposal site. The works included 7 separate sections/pockets of dredging within the harbour. 

 

  • Tara Marie Dredger with EX1200 triple boom Grizzly Excavator
  • Boss Tug
  • 335m3 hopper barge 
Dredger at work at Ullapool Shore Street & Inner Harbour

CLIENT
Ullapool Harbour Trustees

PRINCIPAL CONTRACTOR
RJ McLeod Limited

LOCATION
Ullapool, Northern Scotland

PRINCIPAL SCOPE OF WORKS
dredge approximately 9000m3 of silty gravel material into a split hopper barge and disposal at the nearby approved disposal site.

DURATION
3 weeks (March/April 23)

COMPLEXITY
Challenging

Project Gallery