Description.
FMD was Subcontracted to dredge approximately 9000m3 of silty gravel material into a split hopper barge and disposal at the nearby approved disposal site. The works included 7 separate sections/pockets of dredging within the harbour.
- Tara Marie Dredger with EX1200 triple boom Grizzly Excavator
- Boss Tug
- 335m3 hopper barge

CLIENT
Ullapool Harbour Trustees
PRINCIPAL CONTRACTOR
RJ McLeod Limited
LOCATION
Ullapool, Northern Scotland
PRINCIPAL SCOPE OF WORKS
dredge approximately 9000m3 of silty gravel material into a split hopper barge and disposal at the nearby approved disposal site.
DURATION
3 weeks (March/April 23)
COMPLEXITY
Challenging