Ramp 3 Caisson Removal Dublin Port
Description.
Scope included the demolition and removal of 2 number concrete caissons within Dublin Port. Each caisson was made up of a concrete structure, with 4 reinforced concrete external walls, a top deck, and a base slab. The structure also consisted of internal concrete walls and was filled with a stone/gravel material. All demolition material was loaded onto a hopper barge and recovered to a nearby quay, for onward disposal.
The caisson was broken down utilising a range of excavator attachments, namely rock hammer/shears/concrete pulverizer and buckets. The main plant and equipment on the project were:
- Tara Marie Dredger with EX1200 triple boom Grizzly on board
- Chloe May Tugboat
- 335m3 hopper barge
- ZX300-7 SLF excavator

CLIENT
Dublin Port Company
PRINCIPAL CONTRACTOR
Murphy International Limited
LOCATION
Dublin Port, adjacent to Berth 43
PRINCIPAL SCOPE OF WORKS
Demolition and removal of 2 number concrete caissons within Dublin Port
DURATION
10 weeks (Nov 23 to Feb 24)
COMPLEXITY
Challenging